HERON THERMOELECTRIC POWER PLANT

435 MW GE Gas Turbine Combined Cycle Power Plant

435 MW GE Gas Turbine Combined Cycle Power Plant

Client  Hellenic Public Transmission Operator [DESFA]
Location  Thiva | Greece 
Scope  Mechanical | Piping Design Validation | Construction Supervision | 3rd Party 
Ownership  Moody Hellas 

The project concerned the construction of a 435 MWe combined cycle power plant (CCPP) supplied with natural gas, consisting of:

  • One gas turbine | One generator | One steam turbine on a single shaft arrangement | Heat recovery steam generator | Air cooled condensers | Main feed water pump station | Main and auxiliary electrical buildings including MV and LV switchboards | UPS with batteries | Step-up and step-down power transformers | Emergency diesel generator | Control room | Administration building | Warehouses and workshop | Main and auxiliary pipe rack | Gas (N2, H2) storage facilities | Greases and oils storage facilities | Facilities for storage | Treatment and distribution of industrial, demineralized and potable water | Fire fighting system | Plant air system | Natural gas metering station | Facilities for natural gas compression and heating | Natural gas network | Oily sewer system | Waste water treatment plant | Gas turbine supply networks