ST. THOMAS USVI POWER PLANT CONVERSION

SAINT THOMAS POWER PLANT
SAINT THOMAS POWER PLANT

198 MW GE Gas Turbines Frame 5 & 6 | LPG Conversion |  Storage Bullets capacity 15,000 m3

198 MW GE Gas Turbines Frame 5 & 6 | LPG Conversion | Randolph E. Harley Power Plant | Storage Facilities for 15,000 m3 utilzing LPG Bullets (10 x 1500m3)

Client  Vitol Tank Terminals International [VTTI] 
Location  St Thomas | US Virgin Islands
Scope 

FEED & Detailed Design for Process | Mechanical | Piping | Civil | Construction Supervision | | Commisioning

Ownership  Hiteco Engineering Ltd

The project concerned the Feasibility study, Basic Engineering Design, FEED, Project Management, Construction, erection and installation of the following equipment, Brownfield and Greenfield activities:

  • Import and Export capabilities of the Terminal | Ten mounded LPG bullets ASME VIII Div.2 capacity 14000 m3 | Marine Loading Arm erection | Two Vaporizers, flow capacity 30 tn/hr each | Conversion of the existing GE Turbines (frame 5 and frame 6) from F.O to LPG | Fire Fighting system | Ground Flaring Unit | Accumulator, KO Drums, vessels and tanks | One boiler house, two boilers 4250 KW each, steam production 7 tn/hr | Oil Water Separators | LPG transfer Pump station | LPG export Pump station | Fire fighting pump station | Compressor unit | LPG Mercaptan-Odorizing Station | Generator | Metering stations | Electrical, Wiring and Instrumentation system | Audio/ visual alarms | Main and auxiliary piping | ESD system | Interconnecting piping, auxiliary systems and supply networks | Geotechnical surveys | Tanks foundations | Civil and Building Works | Administration Buildings | Construction of Roads | Steel structures
  • Execution of HAZOP | Pre-commissioning activities assistance | Commissioning activities assistance