BEIRA TANK FARM

BEIRA TANK FARM
BEIRA TANK FARM

Gasoil | Gasoline Tanks capacity 80,000m3

Beira Tank Farm for PUMA Energy in Mozambique | West Africa | 80,000 m3

Client  Trafigura Beheer BV & PUMA Energy 
Location  Beira | Mozambique
Scope 

FEED & Basic Design for Process | Mechanical | E&I | Piping | Civil | Gasoil | Gasoline Tanks capacity 80,000m3

Project Management | Construction Supervision

Ownership  REFCON

The project concerned the Feasibility study, Basic Engineering Design, FEED, Project Management, Construction, erection and installation of the following equipment:

  • Seven API 650 oil storage tanks capacity 80000 m3, internal floating roof, Condensate/Gasoline/Gasoil | One Service water storage tank | One Firewater Storage tank | Product transfer | Pump station | Product export Pump station | Truck loading Pump station | Firefighting pump station | Two truck loading isles for Gasoline | Three truck loading isles for Gasoil | Own independent firewater and foam systems | Sewer System | Oil Water Separator | Electrical, Wiring, Instrumentation system | ESD (Emergency Shut-down) System | Audio/ visual alarms | Main piping | Interconnecting piping, auxiliary systems and supply networks | Office building and a warehouse | Geotechnical surveys | Tanks foundations | Civil and Building Works | Construction of Roads | Steel structures
  • Execution of HAZOP, HAZID, Risk Mitigation plan, Environmental execution plan, Health and Safety plan | Training in Operation | Pre-commissioning activities management | Commissioning activities management | Third Party Inspection management