BOST-APD TANK FARM

BOST-APD TANK FARM
BOST-APD TANK FARM

Gasoil | Gasoline Tanks capacity 155,000m3

Tema Tank Farm for PUMA Energy in Ghana | West Africa | 155,000 m3

Client  Trafigura Beheer BV & PUMA Energy
Location  Tema | Ghana
Scope 

FEED & Basic Design for Process | Mechanical | E&I | Piping | Civil | Gasoil | Gasoline Tanks capacity 155,000m3

Project Management | Construction Supervision

Ownership  REFCON

 The project concerned the Feasibility study, Basic Engineering Design, FEED, Project Management, Construction, erection and installation of the following equipment:

  • Five API 650 tanks total capacity 155000 m3, floating roof type, Gasoil/Gasoline | One firefighting water tank 5,000 m3, fixed roof type | Product transfer Pump station | Product export Pump station | Truck loading Pump station | Firefighting pump station | One Truck Loading Terminal, three top loading islands/dual sided bays capable of four simultaneous multiproduct loading operations | Plant Control System | Operations and Control Building | Electrical Substation | New Sewer System, additional Oil Water Separator | Extension of the Electrical, Wiring, Instrumentation system | ESD (Emergency Shut-down) System | Audio/ visual alarms | Main piping | Interconnecting piping, auxiliary systems and supply networks | Expansion of the existing Firefighting system | Geotechnical surveys | Tanks foundations | Civil and Building Works | Construction of Roads | Steel structures
  • Execution of HAZOP, HAZID, Risk Mitigation plan, Environmental execution plan, Health and Safety plan | Training in Operation | Pre-commissioning activities management | Commissioning activities management | Third Party Inspection management