DISCHARGE CHANNEL BRIDGE | SHOAIBA

Shoaiba Power Plant Stage III | Discharge Channel Road Bridge Crossing

 

 Client Saudi Archirdon for Saudi Electricity Corporation
Location Jeddah | Saudi Arabia
Scope

Detailed design of the bridges substructure and superstructure

Design of a road bridge (total length 120m) over intake channel with five continuous Spans Post Tensioned beams with 4 girders each span| Concrete Piles piers and abutments | Approach Roads and retaining walls.

Ownership Saudi Archirdon Ltd