INDEPENDENT 2ND PARTY ENGINEER
Independed Engineer
Independed Engineer

2nd and 3rd party Quality surveillance of mechanical works, Quality Inspection of pre-fabrications and shop inspection of pipes, sand-screens, fittings, control valves, hand/manual valves, electro-valves, pneumatic valves for FPSO’s, Oil Rigs and Offshore Oil Platforms, Installation Compliance against relevant international Codes ASME, NORSOK, EN-ISO, API, ASTM, Standards and project specifications/Design, Site Acceptance Tests, Following-up of various Vendors’ production and technical/ quality data books, Piping and Circuits Testing prior commissioning, Construction Contractors Documentation packages Review & Approval, Evaluation of Non Destructive Examinations, Participation to MOMs with Owners and Construction Contractors, Inspection on the fabrication and Supervision on the erection of equipment, pressure vessels, pumps and heat exchangers.


LUNDIN PETROLEUM, KVAERNER ASA & AKER Solutions for EDVARD GRIEG Platform
STATOIL-DAEWOO (DSME) & AKER Solutions for GINA KROG Topside Fixed Platform
AKER Solutions for MOHO NORD project
STATOIL for TROLL “A, B, C” Platform, VISUND SOUTH Platform, GRANE Platform, GUDRUN Platform, HEIDRUN Platform, HYME Platform, NJORD Platform, NORNE Project (NORNE production vessel Processing Plant), STATFJORD “A, B, C” Platform, ASGARD “B” Platform, KVITEBJORN Platform, RIMFAKS Platform (satellite of GULLFAK), VALEMON Platform, STJERNE Platform
TOTAL E&P Norge AS for MOHO-BILONDO Phase-1 Congo project
TOTAL E&P Angola for PAZFLOR Project, CLOV Project
KANFA Group for AASTA HANSTEEN Topside EPC Project